« Go back
FILTER
LOGISTIC BUILDING
Redevelopment of the logistics building, including offices and the service block in general.MUSEUM SETUP
Exhibition setup inside the Palazzo Gran Guardia to prepare the art exhibition “From Botticelli to Matisse faces and figures.”LEISURE CIRCUS
Design for renovate a tourist attraction in a Amusement ParkPIPE RACK
New pipe rack to support MEP plant within a new production site.INDUSTRY ELECTRICAL CABIN
System interventions to the production block through the expansion of the dedicated liquid receiving sector, the dedicated big bag receiving sector, the MV/LV electrical transformer substation and the production dressing roomsFEED MILL SILOS TOWER
Project for the construction of an additional processing tower and a new silo unit within the existing production block.ENERGY INFRASTRUCTURE
Installation of solar panels for a food industry to reduce CO2 emission.SPECIAL TOOL FOUNDATION
Design of special foundations for machine toolsLOGISTIC INFRASTRUCTURE AND WATER PROTECTION PLAN
Work to comply with the Water Protection Plan through the construction of a parking lot and a system of works useful for the collection and treatment of stormwater.LUXURY RESIDENTIAL BUILDING
Renovation with extension of an isolated type house and new construction of an additional one dwelling unit within the same lot.