« Go back
FILTER
FOOD INDUSTRY
Project to expand production facility with focus on optimizing production layout and meeting food standards.WASTEWATER TREATMENT INFRASTRUCTURE
Construction of a new purification system consisting of the main elements of the clarifier and purification tanks.TOURISM HOSPITALITY BUILDING
Study and support for safety valutation of hotel’s external coveringsHOSPITALITY PARKING AREA
Work on upgrading and expanding a parking area facing the entrance to the production site.INDUSTRIAL HEATING SYSTEM
Desing and construction of industrial heating system.REAL ESTATE ANALISYS
Property value analysis related to a building to be used for sheltering property owned by the propertyROAD ACCESS TO FOOD FACTORY
Redevelopment of parking lots, access system to the production site and road system on a main roadCONCRETE PREFABRICATED BUILDING
Design of precast concrete elements for a new factory building.MANTEINANCE OF FEED MILL FACADE
Redevelopment of the facades, with punctual interior work, of the production buildings used for storing finished product and receiving raw material.WATER PROTECTION PLAN
Work to comply with the Water Protection Plan through the construction of a system of works useful for the collection and treatment of stormwater.